Common Cargoes
What runs out of Tianjin, and what to watch
These are the cargoes we move out of Tianjin most often. Listing them is not a promise that we take everything — some categories are restricted at destination, and we would rather tell you before you book than after the container is on the vessel.
Almost always a full container, and the packing is the maker's own export carton — no repacking at the port, which keeps the handling cost down.
Note · Models with batteries or refrigerants need separate declaration and different packing.
Usually a mixed full container: assemblies on pallets, wiring harnesses in cartons, and the two stow together without dunnage.
Note · Glass and electronic parts must be moisture-protected; anything with a battery is handled as Class 9.
Flat-stacked and uniform, so it loads in one pass and needs almost no dunnage. The inverter half is what changes the paperwork.
Note · Modules need moisture packing to the carrier's spec; inverters with batteries are declared as dangerous goods.
Heavy enough that the container hits its weight limit before its volume limit, so the packing plan is worked around weight rather than space.
Note · Glass and ceramics are the highest-breakage categories; the stowage plan decides your loss rate.
Small volume, very high value, so it usually travels LCL or shares a container — and the handling is light on the cargo but heavy on the file.
Note · Temperature-sensitive items need a declared temperature range before we quote.
Compresses enough to fill a 40HQ to the roof, so the freight is paid on a very small cube and the loading crew is what determines the saving.
Note · High compression means the volume and weight balance has to be calculated properly or you pay freight you did not need to.
Baled and carton-folded, so it is a clean full container with nothing loose — the cheapest kind of cargo to move once it is packed.
Note · Fabric needs moisture and pest protection — desiccant or fumigation is standard.
The one category on this list that routinely leaves a standard container: heavier pieces go on a flat rack, and the securing plan is agreed with the carrier before loading.
Note · Out-of-gauge pieces must be declared for size and weight before booking, and may need a flat rack.